Dug into side of hillside |
It will also house the controller for the irrigation system |
The water for the irrigation system will come from our drilled well. |
The roof has rebar on top of this and then will have concrete.
Entrance
Inside
Ready for concrete to be poured on top.
Around this will be fill and then soil mounded over top with grass so it will blend into the pasture. Only the entry door will be exposed on the down side of the slope.
Safe at the farm,
Pete, Debby & The Duke
No comments:
Post a Comment